Robot to move 5 to 25 cell mouldings from injection moulding system to stack
Projects
  • budget

    Project Budget:

    Prefer Not To Disclose (€0 - €0)

  • coins

    Average Bid:

    No bids placed yet.

  • location

    Location:

  • category

    Category:

  • calendar

    Posted on:

    11th October 2017 7:28 AM

  • clock

    Time Left:

    300 days, 14 hours, 58 min

  • proposals

    Proposals:

    0

Project Description

Robot to move 5 to 25 cell mouldings from injection moulding system to stack

  • Description:

    small injection moulded parts, but the robot will be handling the mould (5 - 25 cells in each)

  • Total Volume Dimensions (attach drawings to the previous section):

    max 25x25x10mm

  • Type of robot:

    Material handling

  • Other Robot (please elaborate below):


  • Robot operation description (what's it going to do?):

    move parts from one cell to another

  • What type of coordinate frame do you need (select "not sure" if you have no idea)?:

    Not sure / Not listed

  • What is the total work envelope size (Volume W x H x L, m / mm) ?:

    1.5x2x0.75m

  • Number of degrees of freedom required (ignore if you don't know)?:


  • What end effector is needed?:

    Gripper

  • Other end effector (what do you need on the end of the robot)?:


  • What payload does it need to handle, not including the end effector (g/kg):

    2kg max

  • What is the total reach that’s needed (m / mm) ?:

    1.5m

  • How precise does the system need to be (m/mm/micrometers)?:

    +/- 0.5mm

  • What level of repeatability is needed (m/mm/micrometers)?:

    +/- 0.5mm

  • Is there a space restriction. ie whats the maximum volume the whole thing can take up? (W x H x L, m / mm):

    no

  • How fast do you need the robot to be ? (robot arm velocity m/s or mm/s):

    not sure

  • What cycle time is needed? (minutes / seconds):

    1 tray every 4 seconds

  • Any additional robot information ?:


  • What type of solution do you need:

    Equipment, mounting brackets, technical support & training - we dont know how to use any of the equipment but want to know how

  • Does it need to meet any standards (eg CFR 21 Part 11, ATEX, CE, please state all that apply):

    CE

  • Do you need the equipment to be new or used:

    New

  • Are there any environmental conditions the equipment needs to withstand:

    It can be quite hot near the moulding system

  • Do you need after sales technical support, if so, how long for:

    5 years minimum

  • At least how long do you need the warranty to be:

    2 years minimum

  • Additional project details:


Proposals
No proposals placed yet.
Image Gallery
No images.
Map Location